Complete Electrical Power, Propulsion, Dredging & Integrated Control, Automation & Monitoring System Upgrade.
Awarder in 2019 by A&P group, MJR was contracted to deliver a complete turnkey package including engineering, procurement, installation & commissioning as follows:
Engineering was carried out at MJR’s Teesside facility during the last quarter of 2019 including full design approval by Lloyds Register of Shipping with system build and FAT during the first quarter of 2020.
For full details, download our case note: MJR Heortnesse Life Extension Case Study