Large scale mobilisation for McDermott

MJR Power & Automation safely and successfully completed a large scale mobilisation project for McDermott.  

The IMECA Pipe-lay Tower System was installed aboard the new-build North Ocean 105 offshore construction vessel.

Work included:

  • Mobilisation of back deck equipment including 1200 tonne 52m pipe-lay tower, 40ft drive cabinet container, 20ft control container, 40ft HPU container, 20ft workshop. Installation of all power and communications connections between equipment modules.
  • Installation of CCTV, clear comms, DP alert and survey systems throughout the vessel