Explore our featured projects, showcasing cutting-edge solutions in electrical power systems, offshore conversions, and containerised control systems. From extensive upgrades to bespoke installations, discover our expertise in diverse and innovative engineering endeavors.
MJR Power & Automation upgraded JDR's production lines at Hartlepool, replacing obsolete drive systems and installing a new PLC control system. The technically challenging projects showcased expertise, enhancing productivity and reliability.
As part of a multi-vessel contract, MJR Power & Automation efficiently replaced the propulsion control system on Calmac Ferries' Caledonian Isles in just over 14 days. The project, involving over 3000 meters of new cabling and transits, was delivered on time and to specification.
MJR Power & Automation efficiently replaced Ballast, Freshwater, Fuel & Lube Oil, Tank Level Gauging, and Control System. With 700+ I/O points, it provides remote tank gauging, valve control, automatic heeling, and integrates seamlessly with MJR's MAP-OE™, ensuring Lloyds Register of Shipping-approved reliability.
In 2019, MJR Power & Automation, awarded by A&P group, completed a comprehensive upgrade, covering Electrical Power, Propulsion, Dredging, and Integrated Control Systems. The turnkey project achieved Lloyds Register of Shipping design approval in 2019, with system build and FAT conducted in early 2020 at MJR's Teesside facility.