Explore our featured projects, showcasing cutting-edge solutions in electrical power systems, offshore conversions, and containerised control systems. From extensive upgrades to bespoke installations, discover our expertise in diverse and innovative engineering endeavors.
As part of a multi-vessel contract, MJR Power & Automation efficiently replaced the propulsion control system on Calmac Ferries' Caledonian Isles in just over 14 days. The project, involving over 3000 meters of new cabling and transits, was delivered on time and to specification.
MJR Power & Automation efficiently replaced Ballast, Freshwater, Fuel & Lube Oil, Tank Level Gauging, and Control System. With 700+ I/O points, it provides remote tank gauging, valve control, automatic heeling, and integrates seamlessly with MJR's MAP-OE™, ensuring Lloyds Register of Shipping-approved reliability.
In 2019, MJR Power & Automation, awarded by A&P group, completed a comprehensive upgrade, covering Electrical Power, Propulsion, Dredging, and Integrated Control Systems. The turnkey project achieved Lloyds Register of Shipping design approval in 2019, with system build and FAT conducted in early 2020 at MJR's Teesside facility.
MJR Power & Automation successfully completed the design and installation of a state-of-the-art marine CCTV system for the UK's largest ferry operator. Implemented on four ferries across Scottish and Northern English yards, the project adhered to the planned 2020/21 dry docking schedule, achieving on-time and within-budget handovers.
MJR proudly announces the successful re-engineering, upgrade, re-activation, testing, and handover of Deep Energy's main deck winch systems. The project included various electric and hydraulic constant tension winches, showcasing expertise in both ABB ACS 800 Electric Drive and Hydraulic Drive technologies.