Explore our featured projects, showcasing cutting-edge solutions in electrical power systems, offshore conversions, and containerised control systems. From extensive upgrades to bespoke installations, discover our expertise in diverse and innovative engineering endeavors.
MJR Power & Automation delivered a turnkey electrical package for Parkol’s new-build trawler Green Isle, designing and manufacturing main and auxiliary switchboards and integrating generator protection and vessel automation. The team completed onboard installation, cabling, testing and certification, ensuring safe, compliant and reliable power management at sea.
MJR Power & Automation supported Subsea 7 aboard Seven Borealis with two major electrical work packages: preventative maintenance of ABB ACS800 inverter drives for crane and tensioner systems, and a vessel-wide 5-year electrical healthcare survey. The programme ensured Class compliance, improved reliability, reduced risk, and strengthened long-term asset integrity.
MJR Power & Automation delivered a turnkey propulsion and control system upgrade for OSV Relume, replacing obsolete drives and PLCs with modern Siemens technology. The retrofit improved reliability, diagnostics, and maintainability while integrating seamlessly with existing thruster, DP, and vessel control systems, ensuring Class compliance and futureproofed performance.
MJR Power & Automation delivered a turnkey electrical upgrade on the Eni Douglas Oil Platform, replacing VFD Switchboard B and installing four external sine filters. Completed during a planned shutdown, the project improved reliability, safety, and long-term resilience through precise offshore coordination and compliant execution.
MJR Power & Automation modernised the world’s last seagoing paddle steamer, PS Waverley, with a complete electrical upgrade. The project included a new main switchboard, upgraded power management system, emergency switchboard, boiler room rewire, and harbour generator integration, all enhancing efficiency and safety while preserving the vessel’s historic character.
MJR Power & Automation delivered critical electrical and control system upgrades to restore Saltburn Cliff Tramway after a fire in 2024.This included replacing five main control stations with PLC-based systems, industrial Wi-Fi communication, and enhanced safety functionality, ensuring compliance, reliability, and safe reopening of this iconic, local transport landmark.