Explore our featured projects, showcasing cutting-edge solutions in electrical power systems, offshore conversions, and containerised control systems. From extensive upgrades to bespoke installations, discover our expertise in diverse and innovative engineering endeavors.
MJR Power & Automation completed turnkey electrical installation for Prysmian’s Monna Lisa, mobilising a Hydroplow spread for simultaneous cable lay and burial. The project included installing power distribution systems, transformers and junction boxes for deck equipment, ensuring reliable and effective operations for the vessel.
MJR Power & Automation delivered turnkey electrical installations for Prysmian’s Barbarossa I trenching barge. The project included mobilising trenching and cable-laying spreads, installing new power distribution systems, integrating generators, and outfitting accommodation containers. Additional systems such as lighting, fire detection, winch HPUs, and environmental monitoring equipment also supported efficient marine operations.
MJR Power & Automation enhanced TechnipFMC’s Deep Energy vessel by integrating the world’s first DNV-GL certified pipelay extended supply failure ride-through system. This solution ensures uninterrupted tensioner operation, improves safety, protects equipment, and delivers cost-efficient, low-maintenance energy storage, bridging power gaps during supply failures in deep-water pipelay operations.
MJR Power & Automation upgraded SMS Towage’s SMS Roman with a resilient alarm and monitoring system. Featuring Ethernet ring connectivity, advanced data logging, and MAP-OE integration, the solution improves reliability, enables dual-location monitoring, prevents network overload, and ensures continuous operation even during supply failures, enhancing vessel safety and operational efficiency.
MJR Power & Automation delivered turnkey electrical installation for the Prysmian Ulisee’s new AHC crane, working across multiple European ports to avoid disruption of vessel operations. The project included switchboard upgrades, power system integration, and full certification to support the vessel’s enhanced cable laying capabilities on the East Coast of the United States.
MJR Power & Automation completed electrical mobilisation of the T3200 trencher for Enshore Subsea on the JD Assister. This includedi ntegration of a 3000A containerised switchboard, MV/LV cable installation, generator synchronisation, temporary power distribution, cable management design, and auxiliary system connections—executed over 14 days of 24-hour operations at Port of Blyth.