Project Overview

A fictional cooling control retrofit

This internal test scenario describes an MJR Power & Automation control upgrade for Meridian Harbour Research Fleet, a fictional operator. The asset was MV Harbour Meridian, a fictional coastal survey vessel, at the fictional North Quay training berth, UK. The stated project period was September–November 2026.

The commercial marine retrofit concerned an auxiliary freshwater cooling circuit serving survey electronics and workshop equipment. The project objective was to modernise its control and operating arrangements while retaining the existing pumping and mechanical assets. The circuit did not serve propulsion or emergency systems.

The scenario brings together electrical interface surveying, cabinet integration, automation software and commissioning within an existing vessel installation. Its reported performance figures are fictional test results and must be understood in that context.

The Challenge

Manual pressure adjustment and standby intervention

The existing system used ageing relay controls and fixed-speed pump starters. Operators adjusted pressure manually, and a pump fault required attendance at the panel to start the standby pump. Recovery therefore depended on operator intervention.

Basic indicator lamps provided limited information about faults and pump availability. The engineering objective combined three requirements: more stable pressure regulation, automatic standby recovery and clearer operating information.

The replacement controls had to work with the retained pumps, motors and pipework. This made the existing electrical and control interfaces central to the retrofit. Installation also had to fit within a planned 36-hour shutdown, giving the cutover a defined time constraint.

Scope of Work

MJR deliverables and yard support

  • Survey the existing electrical and control interfaces.
  • Design and integrate a replacement control cabinet.
  • Supply two variable-speed drive channels, PLC, remote I/O, touchscreen HMI and process instrumentation.
  • Develop control software, alarm displays and operating sequences.
  • Complete the fictional installation, testing, commissioning and operator handover.

Both existing 11 kW pump motors, the heat exchanger and main pipework were retained. The fictional yard provided mounting, access and lifting support; these activities were outside MJR’s stated contribution.

Solutions Delivered

Variable-speed pumping with automatic standby control

The pumping arrangement comprised one duty pump and one standby pump, each with an 11 kW motor supplied at 400 V AC, three-phase, 50 Hz. Two 11 kW variable-speed drive channels formed part of the replacement controls. The drive manufacturer and model remain unconfirmed.

A Siemens S7-1500 PLC, ET 200SP I/O and TP1200 Comfort HMI provided the automation platform. The control functions included pressure regulation and automatic standby sequencing, addressing the previous need for manual pressure adjustment and panel attendance following a duty-pump fault.

The operator interface included alarms and process trends. Instrumentation covered six measurements: header pressure, suction pressure, flow, supply temperature, return temperature and tank level. These measurements supported visibility of the cooling process alongside the operating sequences and fault displays.

The controls used a dedicated isolated PROFINET network with no internet connection. The stated architecture did not include a redundant PLC, and no SIL certification is claimed.

Delivery & Approval

Preparation, synthetic acceptance testing and handover

Workshop preparation and software testing preceded the alongside installation. The fictional cutover took 30 hours within the planned 36-hour shutdown. Synthetic acceptance results recorded 96/96 FAT checks and 48/48 SAT checks passed.

Handover included drawings, software backups, an operating guide and two operator walkthroughs. No genuine signed acceptance certificate or classification approval exists for this test scenario.

Technical Summary

  1. Circuit service: Auxiliary freshwater cooling for survey electronics and workshop equipment.
  1. Pump arrangement: One duty pump and one standby pump; each motor rated 11 kW.
  1. Motor supply: 400 V AC, three-phase, 50 Hz.
  1. Automation equipment: Siemens S7-1500 PLC; ET 200SP I/O; TP1200 Comfort HMI.
  1. Drives: Two 11 kW variable-speed drive channels; manufacturer and model unconfirmed.
  1. Instrumentation and communications: Six process measurements and a dedicated isolated PROFINET network.

Project Outcomes

Results within the fictional test scenario

The reported improvements were more stable pressure, automatic standby recovery and clearer fault information. At the same synthetic comparison point—40 m³/h, 2.50 bar(g) header pressure and 25°C freshwater—single-pump electrical input reduced from 9.6 to 7.2 kW, a 25% reduction. Pressure variation reduced from ±0.25 to ±0.08 bar.

All 20 standby-transfer trials met the 10-second criterion; the longest recovery was eight seconds. A simulated 24-hour soak recorded no uncommanded stops.

These results are fictional, not verified customer measurements or whole-vessel energy savings. No annual savings figure, customer quotation or long-term reliability claim is available.

Table of contents
Planning a vessel automation project?

Share your vessel, equipment and interface requirements with MJR.

Related Products

Engineering Products Built for Marine & Offshore Operations

MJR’s product ecosystem combines marine automation, shore power, offshore charging and motion compensation technology with the engineering capability required to integrate each system into real marine and offshore projects.

product-image
Marine Automation

VAMOS the marine automation platform for vessel control, alarms, monitoring, power management and operational visibility.

VIeW PRODUCT
Related Services

Services to Support Your Project

From marine electrical design consultancy and engineering through construction, installation, commissioning, repair and testing, MJR supports the complete project lifecycle for newbuild, retrofit and upgrade projects.

product-image
Engineering & Construction

Integrated electrical power, switchboard, control and automation systems engineered, built and tested for demanding marine and offshore applications.

Related Solutions

Solutions for Your Operational Needs

Follow MJR project updates, company news and technical insight covering marine electrical engineering, automation, shore power, offshore vessel charging and vessel electrification.

solution-images
Marine Propulsion

Integrated marine propulsion systems covering electric drives, propulsion control, drive integration, retrofit engineering and commissioning for newbuild and existing vessels.

Related Sectors

Sectors we are Powering

Follow MJR project updates, company news and technical insight covering marine electrical engineering, automation, shore power, offshore vessel charging and vessel electrification.

solution-images
Commercial Marine

Show how MJR designs, installs, commissions and supports product systems.

solution-images
Offshore Wind

Show how MJR designs, installs, commissions and supports product systems.

Related Projects

Relevant Project Experience

Explore MJR projects involving vessel automation, monitoring, control and power management across newbuild, retrofit and upgrade programmes.

No items found.
FAQ

Project questions

Questions and answers about Harbour Meridian Cooling Controls.

What equipment was retained during the Harbour Meridian retrofit?

How did the replacement controls change standby-pump operation?

Which automation platform was specified?

What does the reported 25% reduction represent?

How was work divided between MJR and the fictional yard?

Was formal acceptance or classification approval obtained?