Projects

Marine Electrical Engineering Projects

Explore MJR Power & Automation projects across marine electrical engineering, power distribution, automation and control, vessel upgrades, offshore systems and lifecycle support. Browse delivered work by sector, system and project requirement, with detailed case studies available for selected projects.

Project Archive

Browse Marine Electrical Engineering Projects

Find relevant MJR projects by sector, service, solution and delivery requirement. Each project provides a concise view of the asset, work scope and systems involved, while selected projects link to a more detailed case study.

archive-single-image

For a decade, MJR Power & Automation has actively constructed, tested, and mobilised offshore equipment. Notably, we completed a full electrical installation for Amclyde Norson, offering comprehensive services in marine, industrial, and offshore engineering.

archive-single-image

In 1995, NYK Vega (MSC Messina) had an advanced power generation system. Despite multiple failures, we replaced and re-commissioned the entire system, covering electrical control, power, instrumentation, switchboard modifications, and testing.

archive-single-image

MJR Power & Automation provides a DNV-GL2.7-1 Containerised Power & Control System for a 4000Te Carousel and Tensioner System, in collaboration with a valued client. The project includes modular offshore drive containers, switchboards, MCCs, and other essential components.

archive-single-image

MJR Power & Automation installed a bespoke 500kW Floating Offshore Power Conversion System using ABB's ACS880 drive. The system supports bi-directional low harmonic energy transfer, featuring energy storage for non-generating periods.

archive-single-image

MJR Power & Automation upgraded JDR's production lines at Hartlepool, replacing obsolete drive systems and installing a new PLC control system. The technically challenging projects showcased expertise, enhancing productivity and reliability.

archive-single-image

MJR Power & Automation replaced outdated Terasaki MCCBs and ACBs with ABB marine-certified EMAX2 and XT range on twelve CalMac ferries. The retrofit, part of a resilience program, was completed during scheduled dockings.

Our Process

A Clear Route from Requirement to Handover

MJR structures marine electrical engineering projects around the asset, technical requirement, interfaces, programme and operating constraints, with responsibilities and testing requirements defined as the scope develops.

Discover & Assess

Review the vessel or asset, operating requirements, existing systems, available documentation, access constraints and expected programme.

process-arrow

Engineer the Scope

Define system interfaces, engineering outputs, equipment, responsibilities, testing requirements and project dependencies.

process-arrow

Build & Install

Coordinate equipment procurement, panel or package build, electrical modifications, installation and system integration as required by the agreed scope.

process-arrow

Test & Support

Complete inspection, testing, commissioning and handover documentation, with ongoing service and lifecycle support available where required.

Start a Project Conversation

Share Your Requirements with our Engineering Team

Tell MJR about the vessel or asset, electrical system, location, project stage and expected programme. The team can review the requirement and identify the appropriate engineering, installation or support route.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
FAQ

The Questions We Get Asked Most

Key information for technical, procurement and project teams evaluating MJR for marine and offshore electrical work.

What types of marine electrical engineering projects does MJR support?

Can MJR support both retrofit and newbuild projects?

Can work be planned around an operational vessel or offshore asset?

What information should I provide when discussing a project?

Does MJR provide testing, commissioning and handover support?

Can MJR provide additional project information for procurement or technical review?