Project Overview

MJR Power & Automation Completes IAS Upgrade Aboard MPI Resolution

Power and control cable upgrade for Van Oord on the Kongsberg ACON-R integrated automation system project, delivered inside a two-week dry dock window in Rotterdam.

MPI Resolution was the world's first purpose-built vessel for installing offshore wind turbines, foundations and transition pieces, a combination of proven technologies applied in a new way to give the offshore wind sector a single-vessel installation solution.

MJR Power & Automation was contracted by Van Oord to deliver the power and control cable upgrade supporting the vessel's Kongsberg ACON-R integrated automation system project. The scope covered removal of the existing cabling, then supply, installation, termination and testing of over 2,000 metres of new marine power, ethernet and fibre optic cable.

The cable routes ran the working length of the vessel, connecting the bridge, instrument room, engine control room and thruster spaces. All site works were completed by MJR's installation team during the vessel's dry docking in Rotterdam, within a two-week window.

Project significance An automation system upgrade is only as good as the infrastructure it runs on. Kongsberg's ACON-R upgrade depended on new power, ethernet and fibre routes being in place, tested and proven before the system could be brought into service, and the whole of that installation scope had to fit inside a fixed dry dock period alongside every other trade working on the vessel.

The challenge

A fixed, immovable programme.

Dry docking is booked in advance, shared with every other item of planned work and expensive to overrun. The entire installation scope, removal, installation, termination and testing, had to be complete inside two weeks, with no scope to extend.

Removal before installation.

The scope began with taking the existing cabling out. Removal on a vessel in service means working around containment that is still carrying live circuits, and it consumes programme time before any of the new installation can start.

Cable routes across the full vessel.

Runs connected the bridge, instrument room, engine control room and thruster spaces. Routes that cross multiple decks, pass through machinery spaces and require careful planning of containment and penetrations.

Three cable types, three disciplines.

Marine power cable, Cat5 ethernet and fibre optic each have different handling, bend radius, termination and test requirements. The fibre had to be spliced, terminated and OTDR tested to prove performance before handover.

Watertight and fire integrity to maintain.

Old transits had to be repacked and new transits installed. Every penetration through a bulkhead or deck is part of the vessel's fire and watertight subdivision, so this is certification work, not just cable management.

Another party's system on the other end.

The cabling served Kongsberg's ACON-R upgrade. The installation had to be complete, tested and proven to Kongsberg's requirements so that their commissioning could proceed without waiting on the infrastructure.

Scope of Work

Site works carried out by MJR Power & Automation's installation team during the vessel's dry docking in Rotterdam, over two weeks:

  • Removal of existing power and control cabling
  • 900 metres of Cat5 cable — supplied, installed and tested
  • 350 metres of fibre optic cable — spliced, terminated and OTDR tested
  • Over 800 metres of power cable — supplied, installed and tested
  • Cable containment installation
  • Existing cable transits re-packed
  • New cable transits installed
  • Termination and testing throughout
  • Cable routes between bridge, instrument room, engine control room and thruster spaces

Total: over 2,000 metres of new marine power, ethernet and fibre optic cable.

Solutions Delivered

The Power — Over 800 metres of marine power cable

More than 800 metres of new marine power cable was supplied, installed and terminated to serve the upgraded automation system, replacing the existing power distribution cabling on the routes involved.

The Network — 900 metres of ethernet and 350 metres of fibre

Cat5 ethernet cable was installed across the vessel for the automation network, with fibre optic cable providing the longer and higher-integrity backbone runs. All 350 metres of fibre was spliced, terminated and OTDR tested, giving documented evidence of loss and continuity across every link before handover.

OTDR testing matters on an installation like this: it proves each fibre run performs to specification along its whole length, rather than simply confirming that light arrives at the far end. On a vessel where a fault could later sit behind a bulkhead or inside a containment run, that record is what makes the installation supportable.

The Route — Bridge to thruster spaces

Cables were installed throughout the vessel between the bridge, instrument room, engine control room and thruster spaces. New containment was installed along the routes, existing transits were re-packed and new transits fitted where the new cable routes required penetrations, maintaining the vessel's fire and watertight integrity.

The Method — Delivered inside the dry dock

The complete scope, removal, installation, termination, testing and containment work, was delivered by MJR Power & Automation's installation team in two weeks during the vessel's Rotterdam dry docking, on time and within budget.

Delivery & Approval

Factory Acceptance Tested and Shipped in Eight Weeks

The project was completed on time and within budget during the vessel's dry docking in Rotterdam. MJR Power & Automation was subsequently awarded further marine power and automation upgrade contracts by MPI / Van Oord across other vessels in their fleet.

Quote — Ryan Reilly, Sales and Business Development Manager, MJR Power & Automation:

"With the project delivered on time and within budget, further demonstrating the professionalism and dedication of MJR's marine installation team in successfully delivering these scopes of works. This was further cemented by the award of further marine power and automation upgrade contracts by MPI/Van Oord across vessels in their fleet."

Technical Summary

  • Client Van Oord
  • Vessel MPI Resolution
  • Sector Offshore Wind
  • Scope for MJR Cable removal, supply, installation, termination and testing
  • System served Kongsberg ACON-R integrated automation system upgrade
  • Total cable installed Over 2,000 metres
  • Ethernet 900m Cat5
  • Fibre optic 350m — spliced, terminated and OTDR tested
  • Power cable Over 800m
  • Containment New containment; old transits re-packed, new transits installed
  • Cable routes Bridge, instrument room, ECR, thruster spaces
  • Location Dry dock, Rotterdam
  • Duration Two weeks, site works
  • Outcome Delivered on time and within budget; further fleet contracts awarded

Project Outcomes

On time and within budget inside a fixed window.

The full scope was delivered within the two-week dry dock period, so the vessel's return to service was not affected by the cable installation.

The IAS upgrade was able to proceed.

New power, ethernet and fibre infrastructure was installed, tested and proven, allowing the Kongsberg ACON-R upgrade to be brought into service on the infrastructure MJR delivered.

Fibre performance documented across every run.

OTDR testing of all 350 metres of fibre gave the vessel a recorded performance baseline for future fault finding and maintenance.

Fire and watertight integrity maintained.

Transit repacking and new transit installation kept the vessel's subdivision intact across every new penetration.

Further contracts awarded across the fleet.

MJR Power & Automation was subsequently awarded further marine power and automation upgrade contracts by MPI / Van Oord on other vessels.

Table of contents
Planning a vessel automation project?

Share your vessel, equipment and interface requirements with MJR.

Related Products

Engineering Products Built for Marine & Offshore Operations

MJR’s product ecosystem combines marine automation, shore power, offshore charging and motion compensation technology with the engineering capability required to integrate each system into real marine and offshore projects.

product-image
Marine Automation

VAMOS the marine automation platform for vessel control, alarms, monitoring, power management and operational visibility.

VIeW PRODUCT
Related Services

Services to Support Your Project

From marine electrical design consultancy and engineering through construction, installation, commissioning, repair and testing, MJR supports the complete project lifecycle for newbuild, retrofit and upgrade projects.

product-image
Consultancy & Design

Marine electrical design, FEED studies, calculations and system engineering developed around vessel, offshore and project requirements.

product-image
Engineering & Construction

Integrated electrical power, switchboard, control and automation systems engineered, built and tested for demanding marine and offshore applications.

product-image
Installation & Commissioning

Marine electrical installation, onboard integration, vessel commissioning and functional testing through to technical handover.

product-image
Service, Repair & Testing

Marine electrical service, fault-finding, repair, testing, retrofit and lifecycle support for vessels and offshore assets.

Related Solutions

Solutions for Your Operational Needs

Follow MJR project updates, company news and technical insight covering marine electrical engineering, automation, shore power, offshore vessel charging and vessel electrification.

solution-images
Power Generation & Distribution

Marine power distribution systems covering generation, switchboards, power management systems, load sharing, protection and electrical distribution.

solution-images
Automation & Control

Marine automation systems integrating PLC, DCS, HMI, alarm monitoring, data logging, power management and vessel or offshore control.

Related Sectors

Sectors we are Powering

Follow MJR project updates, company news and technical insight covering marine electrical engineering, automation, shore power, offshore vessel charging and vessel electrification.

solution-images
Ports and Harbours

Show how MJR designs, installs, commissions and supports product systems.

solution-images
Shipyards and Newbuilds

Show how MJR designs, installs, commissions and supports product systems.

Related Projects

Relevant Project Experience

Explore MJR projects involving vessel automation, monitoring, control and power management across newbuild, retrofit and upgrade programmes.

archive-single-image

Pitch Control System Upgrade — Electrical & Cable Infrastructure, Four Ferries

archive-single-image

Design, Supply & Installation for Four Ferries

archive-single-image

Electrical Mobilisation of the World's Most Powerful Subsea Trencher

archive-single-image

Mobilisation of Deck Equipment and Trenching Spreads — Three Ports, Two Countries

FAQ

The Questions We Get Asked Most

Find answers to common questions about the project, including the systems involved, engineering approach, technical challenges and how the solution was delivered.

Can MJR Power & Automation deliver the installation scope for another manufacturer's system upgrade?

How much cable can be installed during a dry docking?

Do we have to supply the cable, or does MJR Power & Automation?

What is OTDR testing and why does it matter on a vessel?

Is cabling for an automation upgrade different from power cabling?

Can you work in overseas shipyards and dry docks?

Do you remove existing cabling as well as install new?

Can you work alongside other contractors during a dry docking?